| Project: |
|
Pilgrim Nuclear Power Plant Sewer Force Main Investigation |
| Client: |
|
Bond Brothers, Inc./ENTERGY |
| Location: |
|
Plymouth, MA |
| Services: |
|
Sewer Force Main Condition Assessment and Repair Recommendations |
Key Features:
 |
Collapsed sewer force main investigation |
 |
Wastewater system constructed in area w/high voltage underground cables |
Watermark
provided engineering services to the power plant’s utility contractor, Bond Brothers Inc. and ENTERGY maintenance staff
for the inspection of a partially collapsed sewer force main associated with the plant’s wastewater collection and
pumping system. The force main had partially collapsed and temporary bypass piping had been installed as an
interim measure.
Watermark’s scope included assistance with field utility identification, on-site inspection, pipe condition assessment
and technical recommendations for repairs.
|