Project:   Pilgrim Nuclear Power Plant Sewer Force Main Investigation
Client:   Bond Brothers, Inc./ENTERGY
Location:   Plymouth, MA
Services:   Sewer Force Main Condition Assessment and Repair Recommendations

Key Features:

 

Collapsed sewer force main investigation
Wastewater system constructed in area w/high voltage underground cables

 

Watermark provided engineering services to the power plant’s utility contractor, Bond Brothers Inc. and ENTERGY maintenance staff for the inspection of a partially collapsed sewer force main associated with the plant’s wastewater collection and pumping system.  The force main had partially collapsed and temporary bypass piping had been installed as an interim measure.

Watermark’s scope included assistance with field utility identification, on-site inspection, pipe condition assessment and technical recommendations for repairs.